RICHLAND COUNTY HIGHWAY     

CONSTRUCTION:

WI DOT WORK ZONE MAPS

Highway Shop Picture

120 Bowen Circle,
Richland Center, WI 53581
608-647-4707

RICHLAND COUNTY HIGHWAY COMMISSION …

120 Bowen Circle, Richland Center, WI 53581
Phone: 608-647-4707

CONSTRUCTION…



STATE CONSTRUCTION PROJECTS…



STH 80:   Richland, Rockbridge, and Henrietta Townships
    2013 Sealcoat
    From Richland Center north to CTH CC
     
STH 131:   Forest Township
    2013 Mill and Overlay
    From Viola Main Street north to Kickapoo River Bridge B-52-52
     
STH 171:   Dayton Township
    Bridge replacement - Bridge B520008
    In Boaz
    2012
     
STH 171:   Dayton and Akan Townships
    CRC Project
    Crawford Co Line north to USH 14
    2012 - 2013
     
USH 14:   Richland Township
    2012 Pavement replacement
    .24m East of STH 171 East to Hive Drive
     
USH 14:   Richland Township
    2012 Pavement replacement
    Hive Drive East to West 6th Street in Richland Center
     
USH 14:   Richland Township
    2014 Const ops/Recst, Safety HSIP
    Peebles Drive to CTH "O"
     


COUNTY ROAD CONSTRUCTION PROJECTS…



CTH "NN":   Westford Township
    CTH "S" to CTH "I"
    Length of 1.533 miles
    2011 Construction
    CHIP Funding
     
The highway crews did extensive dirt work all along CTH NN. CTH NN CONSTRUCTION
CTH "S":   Westford Township
    Michaels Road to Sauk County Line
    2011 Construction
    TRIP Funding
     
This is an intersection at CTH S and CTH NN. This intersection was improved for safety reasons. Where the 2 highways intersected was uneven and difficult to drive through. CTH NN CONSTRUCTION
Here is the improved intersection. CTH NN CONSTRUCTION
Below is an old box culvert on CTH S. This is what the culvert looked like before construction. CTH S CONSTRUCTION
Below you can see how the highway employees have the new metal culvert placed inside the old box culvert. CTH S CONSTRUCTION
The final picture is when the highway employees filled sand bags with a concrete mixture. Concrete was used to fill in the space between the old box culvert and the new metal culvert. CTH S CONSTRUCTION
CTH "O":   Orion Township
    CTH OO to Oakridge Drive
    2012 Dirt work
    2013 Mill and pave.
     
CTH "O":   Orion and Richland Townships
    CTH OO to USH 14
    2015 Reconstruction
     
     


COUNTY BRIDGE CONSTRUCTION PROJECTS…



CTH "E":   Marshall Township
    South of Quarry Hill Road
    Boaz - Sabin area
    2012 Construction - Mill Creek Bridge
    Local Bridge Program
     
CTH "F":   Richwood Township
    South of Excelsior
    STH 60 - STH 171 area
    2012 Construction - Knapp Creek Bridge
    Local Bridge Program